![]() The project is engineered by internationally renowned architects with 1 BHK and 2 BHK Apartments. ![]() SKYi Songbirds Phase D is in the company of schools, hospitals, shopping destinations, tech parks and every civic amenity required, so that you spend less time on the road and more at home. SKYi Songbirds Phase D comprises every modern amenity required for a luxury living namely 24Hrs Backup Electricity, CCTV Cameras, Club House, Convenience Store, Covered Car Parking, Cycling Track, Gym, Indoor Games, Jogging Track, Landscaped Garden, Lift, Party Area, Rain Water Harvesting, Recreation, Security Personnel and Senior Citizen Park. The project hosts in its lap 204 exclusively designed Apartments, each being an epitome of elegance and simplicity. SKYi Songbirds Phase D is an ultimate reflection of the urban chic lifestyle brought to us by SKYi Developers. SKYi Songbirds Phase D goal is to deliver developments that are finely crafted, and where the quality of finish shine through in every development, from inception to completion. The development permit application will come before Nanaimo city council at a later date.Located at Bavdhan, Pune, SKYi Songbirds Phase D is inspiring in design, stirring in luxury and enveloped by verdant surroundings. “There’s definitely a need for more housing units and a mix of housing units, too, so this is providing that,” Holm said. He said as time passes between re-zoning and permitting, market conditions sometimes change and developers respond to those changes. “Basically through re-zoning, we’re looking at the land-use proposal more than anything and looking at how that proposal aligns with the policy objectives, largely in the official community plan.” “At the re-zoning stage, it’s more conceptual…” he said. Jeremy Holm, the city’s director of development approvals, told the News Bulletin it’s not out of the ordinary for project plans to change between the re-zoning and development permit stage. The panel recommended finding ways to better distinguish and frame the main entrance, considering darker-coloured railings or use of frosted glass on patios, and moving the garbage area to the underground parking garage. The design panel expressed support for the height and setback variances. The applicant is asking for three variances: a height variance from 18m to 18.4m, a front-yard setback variance from 3.5m to 2.5m, and a parking variance from a maximum of 40 per cent small-car spaces to 41 per cent. Parking will be 80 per cent underground with the remainder surface parking. The proposed building is L-shaped with one section facing Rutherford Road and the other section facing a wetland area on the eastern portion of the property. The 108 units will be configured as 68 one-bedroom apartments, 32 two-bedroom apartments and eight three-bedroom apartments. “The project build completed when the market was very slow but the project did very well, which proved the location of the project is promising and well-located to all amenities in the area.” “Around 10 years ago we designed and built a 63-unit apartment building across the pond,” he noted in his application. The city has now received a development application from the same owner for a five-storey, 108-unit apartment building on the property.Īrchitect Daryoush Firouzli presented plans to the city’s design advisory panel last week. for development in the fall of 2019, when the proposal on the table was for a four-storey, 76-unit apartment building. ![]() ![]() Nanaimo city council re-zoned 4961 Songbird Pl. The city is looking over designs for an apartment building project near Nanaimo North Town Centre that has grown somewhat over the past year and a half. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |